Scheme of Work on Building Construction

Curriculum for Senior Secondarys

FIRST TERM
SSS 1 SSS 2 SSS 3
Wk 1: Revision Wk 1: Revision Wk 1: Revision
Wk 2: Definition of Building Wk 2: Elevation Wk 2: Scalling Enlargement and Reduction
Wk 3: Classification of Building Wk 3: Sections Wk 3: Roof Covering
Wk 4: Building Construction Wk 4: Special Details Wk 4: Ceilling
Wk 5: Construction Team Wk 5: Excavation and Earthwork Wk 5: Plumbling and Drainage System
Wk 6: Workshop / Site Safety Wk 6: Excavation Prolems Wk 6: Solar Systems
Wk 7: Tools, Equipment and Machines Wk 7: Plastering and Rendering
Wk 8: Site Organisation and Layout Wk 8: Floor Finishes
Wk 9: Site Clearing and Levelling
SECOND TERM
SSS 1 SSS 2 SSS 3
Wk 1: Revision Wk 1: Revision Wk 1: Revision
Wk 2: Setting Out Wk 2: Foundation Wk 2: Ceiling Finishes
Wk 3: Building Drawing Wk 3: Ground Floor Wk 3: Fence and Fencing
Wk 4: Excavation and Earthwork Wk 4: Wall Openings Wk 4: Gates
Wk 5: Foundation Wk 5: Suspended Upper Floor Wk 5: Access Road
Wk 6: Ground Floor Wk 6: Concrete Wk 6: Landscaping
Wk 7: Materials for Concrete Wk 7: Locally Sourced Building Materials
Wk 8: Materials for Concrete (contd) Wk 8: Alternative Cement Binders / Aggregates
THIRD TERM
SSS 1 SSS 2 SSS 3
Wk 1: Revision Wk 1: Revision Wk 1: Revision
Wk 2: Walls Wk 2: Roofs Wk 2: Bricks
Wk 3: Walling Materials Wk 3: Drainage Installation Wk 3: Health and Safety
Wk 4: Manufacturing of Walling Materials Wk 4: Sanitary Appliances and Installation Wk 4: National Building Code
Wk 5: Wall Construction Wk 5: Types of Elecrical Wiring Materials Wk 5: Types of Business Organizations and Ways of Raising Capital
Wk 6: Drainage System Wk 6: Book keeping
Wk 7: Plumbing Installation Wk 7: Contract Work
Wk 8: Electrical Installation